Autoconst Claude Change Order Audit — Security skill for Claude Code
Audit a contractor's change-order proposal against the contract's rate schedule and the drawings — in seconds instead of 1–3 hours per CO.
How to install Autoconst Claude Change Order Audit
This entry records only its repository, not the path inside it, so there is no
exact command to give. Open hamzaabduljabbar/autoconst-claude-change-order-audit and copy the folder into
~/.claude/skills/, or the file into ~/.claude/agents/.
What Autoconst Claude Change Order Audit does
**Audit a contractor's change-order proposal against the contract's rate schedule and the drawings — in seconds instead of 1–3 hours per CO.**
Alternatives in Security
- /web3 Audit — Smart contract security audit using the 10-bug-class methodology 927 ★
- MCP Security Checklist (SlowMist) — Comprehensive checklist: input validation, rate limiting, RBAC, credential management, container hardening 819 ★
- ThinkWatch — Self-hosted AI API and MCP gateway for organizations: SSO and RBAC, per-user identity for MCP tool calls, PII 817 ★
README
Change-Order Pricing Audit
**Audit a contractor's change-order proposal against the contract's rate schedule and the drawings — in seconds instead of 1–3 hours per CO.**
Owner / PM-side tool. A contractor sends a change order PDF; a PM normally opens the CO, opens the contract's rate schedule, opens the drawing, and cross-checks line-by-line in Excel — hunting for inflated markups, stacked O&P, padded labor rates, and quantities that don't tie to the drawing. This tool does that pass deterministically and returns dollar figures with page anchors.
It ships as a [Claude Code](https://docs.claude.com/en/docs/claude-code) skill, but the engine is a plain Python CLI you can run on its own.
Why
Every finding is a **$ overcharge tied to a page** — not an opinion. Judgment calls ("is 42 hours reasonable for this scope?") are surfaced for a human, never ruled on. For this persona a wrong "this is padded" costs more trust than staying quiet.
Three problems every honest CO auditor has to handle, baked in by design:
| Problem | How the tool handles it |
|---|---|
Column reflow. pdftotext prints the $ext column out-of-row from the description; naïve tie-out fabricates ~10 false discrepancies on a clean doc. |
Parsers read only rate and quantity from the line and recompute — the printed $ext column is never trusted. |
| Silent invalidity. "0 findings" can mean the CO is clean OR that no reference doc was supplied. | Coverage-aware summary: 0 findings — but only N of 4 checks had the data to run, with a per-check [checked] / [NOT CHECKED] + reason breakdown. |
| Scanned pages. A number read from an image must never carry the same certainty as vector text. | Scan pages are rendered to PNG, Claude transcribes them into a sidecar .txt, the same checks run — but every finding on a scan-derived page is stamped [SCAN - verify against source page N]. |
Install
Requires **Python 3.10+**, **Poppler** (`pdftotext`, `pdftoppm`), and one
Related Skills
Pocketpaw
Your AI agent in 30 seconds. Not 30 hours. Self-hosted, open-source personal AI with desktop installer, multi-
API Contract Audit
Inventory every API endpoint that surfaces a field to clients BEFORE dropping, renaming, or semantically chang
Google Business Profile AI Automation
Audit a Google Business Profile against 39 local SEO rules, get a client-ready HTML report, then fix it: rewri
API Contract Review
API platform contract review. Invokes api-platform-reviewer to audit rate-limit design, OAuth scope hygiene, w
Exploit Live
Generate an exploit against a deployed contract on a fork. Validates the exploit works on live state.
Swarm Review
Audit .swarm/active/PLAN.md and TEST_PLAN.md against the active SwarmOS WorkUnit contract
Related Agents
Realestate Estimator Sow
Turns vague client briefs and property needs into precise Statements of Work with hours, risk buffers, timelin
Habit Coach
Reads how the learner has actually been working (hours, sessions, reviews against new material, accuracy by ti
Legal Review Lead
Orchestrator for contract and lease review. Use when the user or a client asks to "review this lease/contract/